Seemingly, 99% of inspectors allow Generac (TCER) cable to be ran on the outside of a home, much like aluminum service cable.
One inspector requires it to be installed inside conduit/flex. Obviously, I was not to happy to have to expend the extra trip, labor and materials to tear-out and re-install.
Different AHJ interpretations of the code in different local jurisdictions is quite impossible to manage for us contractors.
Seeking comments on:
1) General consensus on Generac Cable.
2) How to tighten up "interpretation" of NEC by inspectors.